We were tasked with an artroom refresh and modernisation. Initially a site survey and measure up was completed, CAD designs were put together to ensure the spacing was workable.
New table frames were manufactured to incorporate under table storage. The bespoke furniture was preassembled in our Bristol workshop to speed up the installation time.
The artroom, including a teacher wall, took 3 days to install and resulted in a truly insprational learning enviroment with increased storage.